4.4.2022 - 4.10.2022 Back to Crown Bay & New Boat Friends
- Courtney Waxman
- Apr 15, 2022
- 1 min read
This week we coordinated with Jessy's team to finish the solar panel installation and a trucking company to deliver the hardtop to align with our return to Crown Bay marina. This time our slip was C12-14 and we made our approach with no delay.


The next day (4.6.2022) Mark showed up to install our new solar panels! Instead of having two * watt panels on our array above the dinghy davits, we upgraded to four 375-watt panels (1500 total watt).



In preparation for the hardtop delivery, we also took down the old softtop - we saved the plastic enclosure since we won't get the enclosure that goes with the hardtop until we're back in Florida.
The hardtop was delivered on 4.7.2022 by a trucking company and crew - they were a huge help in getting all the parts loaded on the boat (see below slideshow). Included in the shipment was the hardtop, the fiberglass support stands, 3 temporary supports, and two 375-watt solar panels.
The hardtop installation is a process so I'll detail that in the next post :)
Later in the week, we connected with a fellow liveaboard cruiser Bob, who has a Lagoon 500 (bigger version of our boat) and is also from Arizona! We met Bob for dinner at a local restaurant near the marina, Bonita's Cantina, and had great time chatting about the cruising/boating/sailing lifestyle :)